Maurice Cody Junior Public School

Our comprehensive façade restoration, window upgrades, and structural column repairs improved safety, reduced the risk of water infiltration, and extended the school’s service life while preserving its historic character.

Lead Contact

maschke
Ken Maschke
Associate Principal
kmaschke@thorntontomasetti.com +1.416.306.8106 Toronto Click to download CV

Project Details

Project Partners
Torcom Construction, Inc.
Owner
Toronto District School Board
Location
Toronto, Ontario, Canada
Completion Date
Area
75,148 ft²
Number of Stories
3
For Toronto’s Maurice Cody Junior Public School, maintaining a safe, resilient environment meant improving both the building façade and its underlying structure.
Maurice Cody Junior Public School in Toronto, Ontario. Thornton Tomasetti
As prime consultant, Thornton Tomasetti provided coordinated structural engineering, building envelope, and building science services for the renovation.
Maurice Cody Junior Public School in Toronto, Ontario. Thornton Tomasetti
The team applied technical research, data analysis, and engineering principles to assess and improve the school’s performance and durability while meeting the requirements of the local school board.
Maurice Cody Junior Public School in Toronto, Ontario. Thornton Tomasetti

Restoring the Building Envelope 

For Toronto’s Maurice Cody Junior Public School, maintaining a safe, resilient environment meant improving both the building façade and its underlying structure. As prime consultant, Thornton Tomasetti provided coordinated structural engineering, building envelope, and building science services for the renovation. The team applied technical research, data analysis, and engineering principles to assess and improve the school’s performance and durability while meeting the requirements of the local school board. 

Façade and window replacement work for the century-old school adhered to stringent Canadian heritage-conservation standards. The façade restoration included replacing damaged brick, repointing masonry, restoring stonework, and installing new flashing and sealant systems to protect against water infiltration. Existing windows were replaced with new units that meet current safety codes and regulations, incorporating fire-resistive glazing and security screens where required. 

Repairing Embedded Steel Columns 

Structural repairs focused on steel columns embedded in the building façade. The team installed specialized temporary shoring to support the stone masonry during repairs and field-welded reinforcements to the existing columns.