New York, New York
The newly renovated airport features a consolidated checkpoint and baggage claim designed to improve operational efficiency and passenger experience.
Spokane is ready for takeoff. The newly renovated Pacific Northwest airport reflects the region’s effortless beauty and detail. Echoing the iconic natural ambiance, the two-story building will include a 50-foot-tall glass façade along the curbside with an expressive roof design that includes exposed structural tree-like columns and clerestories.
We are the structural engineer for the Terminal Renovation and Expansion (TREX) program which includes an expansion of the existing C concourse and an elevated walkway to streamline pedestrian traffic between terminals. With multiple phases of demolition, TREX tackles internal efficiency and external functionality and aesthetic within one project.