Thornton Tomasetti renewed two occupied apartment towers in Toronto, Ontario, combining façade repairs with hybrid overcladding to improve envelope performance and extend service life.
Built in 1973, the two residential towers at 191 and 201 Sherbourne Street were shaped by Toronto’s postwar housing boom. Fifty years later, exposure to the city’s weather had left the concrete façades cracked and spalled, while the original single-pane windows and masonry kneewalls no longer met the needs of contemporary housing. The owner set out to improve safety, comfort, and long-term value without erasing the buildings’ Brutalist character or displacing residents for an unnecessary wholesale rebuild. Thornton Tomasetti served as an integral contributor to that long-term renewal effort through connected efforts: façade and envelope renewal, structural engineering for lobby and amenity renovations, waterproofing and garage repairs, and roofing repairs.
Our team provided combined façade engineering, structural engineering, building science, and renewal expertise. The team began with visual reviews from grade and at representative balconies, then used an in-house artificial intelligence tool to help identify and quantify areas of spalled concrete. A near-hand investigation and loose-spall removal program covering the entire façade from swing stages, followed and informed repair drawings and quantities for the balconies, exposed walls, and architectural roof structures.
The renewal strategy paired concrete restoration with a hybrid overcladding system. Elastomeric coatings protect repaired balcony slabs and exposed walls, while a new curtainwall assembly shields the existing masonry kneewalls and slab edges from continued weathering. Double-glazed, argon-filled windows replaced the original single-pane units. Thermal and hygrothermal analysis guided the detailing of window, flashing, and curtainwall interfaces, helping the team balance energy performance, moisture management, constructability, and cost. The result is an envelope that performs better without requiring wholesale kneewall reconstruction.
The renewal continued at ground level with renovations to the lobbies and shared amenity areas. New openings in the concrete shearwalls required careful structural intervention. Our engineers designed steel plating around the openings and at the remaining piers to reinforce the existing structure and allow interior renovations to proceed. This work extended the project’s central idea from the façade to the building’s daily experience: preserve what works, strengthen what needs attention, and make room for a more welcoming and contemporary residential environment.
A third project component focused on the plaza and parking-garage areas, where water management and concrete durability were central concerns. We developed and supported a repair program that included elastomeric coatings at protected exterior spaces, re-waterproofing at expansion joints, soffit and slab patching, and foundation wall water cut-off injections. These practical measures protect vulnerable areas, reduce recurring maintenance demands, and support the larger goal of extending the life of the two towers.
The 191–201 Sherbourne Street project demonstrates the value of treating a complex residential renewal as one connected effort. Our integrated expertise helped the project team give two occupied apartment towers a longer, more resilient future – one that respects their original architecture while repositioning them for contemporary housing needs.