Here's How:
We Never Said "No"
With no identical floors, the building was inherently difficult to design, engineer and construct. The architectural team began a whirlwind process of almost daily iterations. We needed an equally swift engineering response, but structural calculations take time, and there was no way around it.
So we created one. Combining Rhino models with Grasshopper and custom scripts, we developed a fast and flexible way to interactively study multiple options. This let us evaluate design variations based on meaningful metrics and enhanced visualizations – and rapidly respond to changes with clear, thorough answers. Then we could quickly make decisions together as a team, kicking the overall design schedule into high gear.
We Thought Smart to Simplify Structures
Complex buildings are rarely inexpensive. For VIA 57 West, we formulated the most efficient and cost-effective structure possible. Instead of a single, complicated system, we split the unconventional structure into two typical ones. Then we devised ultra-custom creative solutions for specific challenges – such as the courtyard foundations, floor setbacks, and the window-washing rig.
Then we called on New York City’s top concrete contractors to help us make sure it was buildable and affordable. By working with them early on, we were able to find and fix potential trouble spots before construction began. One example: a custom expansion joint made one big building behave like two smaller, separate structures, reducing material shrinkage by one-third.
Built in Resilience
VIA 57 West’s location is vulnerable to flooding. When Superstorm Sandy arrived, standard resilience measures were novelties. Responding to the storm’s warnings, we raised the first-floor slab, put flood walls around the entire perimeter, and specified portable flood logs to jam doorways. We moved electrical transformers to platforms within the building, to safeguard them during a flood.